Add to Gallery: | Add this photo to a Gallery |
Category: | General road environment: Other (infrastructure-related) |
Tags: | cambridge, covid-19, millroad |
Date time: | 2.25pm, Saturday 27th June, 2020 |
Time line: | Earlier | Later |
Facing: | East |
Added by: | simon |
Copyright: | Public domain |
Download: | View full-size original |
Credit: | timbo |
Area: | Cambridge |
Carriageway-narrowing / footway-widening for social distancing on Mill Road - linked with the closure of the railway bridge.
Comments reflect the views of the original submitter only.